Sydney Inner West · Est. 2004

Sydney's trees
are your liability.
We make them
your asset.

Hazard removal beside live power lines, crane-assisted extractions, stump grinding to slab level — insured to $20M, compliant with every Sydney council arboricultural standard.

$20M Public LiabilityAQF Level 5 ArboristsAS 4373 Compliant24/7 Emergency Response
Aerial straight-down view of dense Sydney suburban tree canopy pressing against rooflines, with a crane boom visible at the frame edge

Recent Operation

Leichhardt Council

14 × Class A hazard eucalypts
removed adjacent 11kV line.
Zero network interruption.

4 daysstart to sign-off

01 — Procurement Question

"What insurance limits and SWMS documentation do you carry to satisfy our procurement threshold?"

Asked by: Council Procurement Officers & Strata Managers

$20M

Public Liability Cover

Procurement-grade compliance, already packaged.

Every job ships with a project-specific Safe Work Method Statement, Certificate of Currency for $20M public liability and $5M professional indemnity, and a current WorkCover NSW policy. Our arborists hold AQF Level 5 (AQF Certificate V in Arboriculture) and all operations comply with AS 4373–2007 Pruning of Amenity Trees. Council tender documentation takes under 24 hours to compile. We have pre-qualified supplier status with Inner West Council, Strathfield Council, and Canada Bay Council.

$20M Public Liability$5M Prof. IndemnityAQF Level 5AS 4373-2007WorkCover NSW

Supplied full SWMS & COC within 2 hours for Marrickville Metro emergency tender — 2024.

Arborist crew working at height with elevated work platform beside suburban tree in storm conditions
2 hrs

Emergency Callout SLA

24/7 operations. Not an answering service — an active crew.

Our emergency line connects directly to a Level 5 arborist, not a call centre. We maintain a dedicated storm-response crew on standby from June through September, with a two-hour on-site SLA for Inner West and a three-hour SLA across Greater Sydney. Equipped with a 100kN elevated work platform and rigging gear, we can stabilise or remove a failed limb over a live conductor without waiting for Ausgrid access. In the 2022 East Coast Low event, we completed 31 emergency callouts across 14 strata properties in 72 hours.

24/7 Active Crew2-hr Inner West SLAEWP 100kNAusgrid Accredited

31 emergency callouts, 14 strata properties, 72 hours — East Coast Low 2022.

02 — Procurement Question

"What is your guaranteed response time for emergency storm callouts outside business hours?"

Asked by: Strata Portfolio Managers & After-Hours Coordinators

03 — Procurement Question

"Can your fleet and crew capacity handle a multi-site portfolio clearance to a hard construction deadline?"

Asked by: Construction Project Managers & Development Consultants

12

Operational Crew Units

Fleet-scale clearing. Deadline-bound delivery.

Canopy operates three 100kN EWPs, two 17-tonne crane trucks, six chipper/chaser units, and a 120HP stump grinder capable of grinding 600mm stumps to 400mm below finished ground level — slab-ready by any structural engineer's standard. We have cleared 2.4 hectares of mixed urban canopy to slab-ready in five working days on a Dulwich Hill mixed-use development. Our project manager delivers a daily progress report against a Gantt schedule. We carry a $2M construction works policy for all site-clearing contracts.

3 × EWP 100kN2 × 17t Crane Trucks6 × Chipper Units120HP Stump Grinder$2M Construction Works

2.4ha cleared to slab-ready in 5 days — Dulwich Hill mixed-use development, 2023.

Ready to Proceed

Request a Service Agreement.

We'll prepare a scoped proposal within 48 hours — including SWMS, insurance certificates, and a fixed-price schedule. No retainer, no lock-in until you countersign.

Proposal within 48 business hours

Fixed-price, no hidden mobilisation fees

Pre-qualified supplier documentation included

Direct line to your assigned arborist

Service Agreement Request

Service Type (select all that apply)

Your information is used solely to prepare your proposal. We do not share data with third parties.

For Researchers & Evaluators

Download our Capability Statement.

A 12-page document covering fleet inventory, arborist qualifications, insurance schedule, council compliance history, and three full case studies. Suitable for internal procurement review or board sign-off.

12

Pages

PDF

Format

Feb 2026

Updated

Instant PDF Delivery

Work email only. No marketing. Unsubscribe any time.