Sydney's trees
are your liability.
We make them
your asset.
Hazard removal beside live power lines, crane-assisted extractions, stump grinding to slab level — insured to $20M, compliant with every Sydney council arboricultural standard.
Recent Operation
Leichhardt Council
14 × Class A hazard eucalypts
removed adjacent 11kV line.
Zero network interruption.
01 — Procurement Question
"What insurance limits and SWMS documentation do you carry to satisfy our procurement threshold?"
Asked by: Council Procurement Officers & Strata Managers
Public Liability Cover
Procurement-grade compliance, already packaged.
Every job ships with a project-specific Safe Work Method Statement, Certificate of Currency for $20M public liability and $5M professional indemnity, and a current WorkCover NSW policy. Our arborists hold AQF Level 5 (AQF Certificate V in Arboriculture) and all operations comply with AS 4373–2007 Pruning of Amenity Trees. Council tender documentation takes under 24 hours to compile. We have pre-qualified supplier status with Inner West Council, Strathfield Council, and Canada Bay Council.
Supplied full SWMS & COC within 2 hours for Marrickville Metro emergency tender — 2024.
Emergency Callout SLA
24/7 operations. Not an answering service — an active crew.
Our emergency line connects directly to a Level 5 arborist, not a call centre. We maintain a dedicated storm-response crew on standby from June through September, with a two-hour on-site SLA for Inner West and a three-hour SLA across Greater Sydney. Equipped with a 100kN elevated work platform and rigging gear, we can stabilise or remove a failed limb over a live conductor without waiting for Ausgrid access. In the 2022 East Coast Low event, we completed 31 emergency callouts across 14 strata properties in 72 hours.
31 emergency callouts, 14 strata properties, 72 hours — East Coast Low 2022.
02 — Procurement Question
"What is your guaranteed response time for emergency storm callouts outside business hours?"
Asked by: Strata Portfolio Managers & After-Hours Coordinators
03 — Procurement Question
"Can your fleet and crew capacity handle a multi-site portfolio clearance to a hard construction deadline?"
Asked by: Construction Project Managers & Development Consultants
Operational Crew Units
Fleet-scale clearing. Deadline-bound delivery.
Canopy operates three 100kN EWPs, two 17-tonne crane trucks, six chipper/chaser units, and a 120HP stump grinder capable of grinding 600mm stumps to 400mm below finished ground level — slab-ready by any structural engineer's standard. We have cleared 2.4 hectares of mixed urban canopy to slab-ready in five working days on a Dulwich Hill mixed-use development. Our project manager delivers a daily progress report against a Gantt schedule. We carry a $2M construction works policy for all site-clearing contracts.
2.4ha cleared to slab-ready in 5 days — Dulwich Hill mixed-use development, 2023.
Request a Service Agreement.
We'll prepare a scoped proposal within 48 hours — including SWMS, insurance certificates, and a fixed-price schedule. No retainer, no lock-in until you countersign.
Proposal within 48 business hours
Fixed-price, no hidden mobilisation fees
Pre-qualified supplier documentation included
Direct line to your assigned arborist
Download our Capability Statement.
A 12-page document covering fleet inventory, arborist qualifications, insurance schedule, council compliance history, and three full case studies. Suitable for internal procurement review or board sign-off.
12
Pages
Format
Feb 2026
Updated